Introduction to the challenges faced during the production planning stage in rubber molding and processing, and their solutions.
I'm worried that the schedule is tight and the delivery time for the mold may not be met. Do you have any concerns like wanting to reduce costs as much as possible?
Our company handles many products from various mold manufacturers. We have a track record of completing mold production, which usually takes 1 to 1.5 months, in just one week for simpler shapes, so please consult with us as soon as possible.
Additionally, since our company does not incur intermediate margins, we can expect a cost reduction of over 10% compared to general manufacturers. We have six large rubber molding machines (vacuum 300-ton molding machines) and can accommodate large lots.
[Solutions to these concerns]
■ Worried that the schedule is tight and the delivery time for the mold may not be met
■ Want to reduce costs as much as possible
■ Looking for a factory that can handle orders because the current supplier or business partner is at capacity
*For more details, please refer to the PDF document or feel free to contact us.